Competitive PCB Manufacturer

quick turn prototype gold plating PCB with Counter sink hole

Short Description:

Material  type: FR4

Layer count: 4

Min trace width/space: 6 mil

Min hole size: 0.30mm

Finished board thickness: 1.20mm

Finished copper thickness: 35um

Finish: ENIG

Solder mask color: green“

Lead time: 3-4 days


Product Detail

Product Tags

Material  type: FR4

Layer count: 4

Min trace width/space: 6 mil

Min hole size: 0.30mm

Finished board thickness: 1.20mm

Finished copper thickness: 35um

Finish: ENIG

Solder mask color: green``

Lead time: 3-4 days

quick turn prototype

The prototyping stage is the most critical period for a research and development program .

To Shorten the research and development time, you require the PCB manufacturer to produce prototype faster.

Then the quick turn prototype emerged.

For manufacturing PCB, Kangna has the experience of manufacturing PCB for more than 14 years(since 2006). Choosing us  can not only shorten the manufacturing time of the PCB but also reduces the cost and get the high-quality boards. We can provide you with high quality prototype with shortest production time at the competitive price.

Normally ,if total area of your odered PCB is less than 0.1 square meter, we take the order as prototype.

No MOQ limited, even if you order one PCS, we will accept the order seriously.

The normal lead time is 5 days for single sided and  two layers board, 7 days for 4 layer, 9 days for 6 layer,10 days for 8 layer,12 days for 10 layer board.

For quick prototype,  we can finish production of the prototype of single sided and two layer board within one day or two days,  3-4 days for 4 layer, 4-5 days for 6 layer,5-6 days for 8 layer,6-7 days for 10 layer board.

The less the working day is  , the more expensive the price.

After accepting your order, our engineer will audit your Gerber files to make sure it complies with our technical capability. Once the files pass the audit, you can pay the cost . Then our engineer will check again and optimize the files to make production. Sometimes some engineering question will arouse.

To finish the production on time, you need to reply the engineering questions from our engineer on time as soon as possible.

The time spent on engineering question not counted as the production time.

If you order after P5.00 china time, the production time will be counted from the day after tomorrow.


  • Previous:
  • Next:

  • Write your message here and send it to us

    PRODUCT CATEGORIES

    Focus on providing mong pu solutions for 5 years.